Cuplock quantity planner

From slab dimensions
to a coded enquiry.

Configure the grid using your engineer-selected component sizes, calculate geometric quantities and send the exact Vidaform codes to the catalogue enquiry. This tool counts components; it does not make structural design decisions.

01 / PROJECT GEOMETRY

Define the slab zone

Enter the clear plan dimensions. Geometry updates immediately and feeds the Cuplock grid below.

NET AREA108.00
PERIMETER42.00m
CONCRETE VOLUME21.60
02 / CUPLOCK QUANTITY PLANNER

Configure the grid

You choose every component size and ledger level. The planner only performs geometric counting—it never selects structural spacing.

7 bays / 12.60 m8 bays / 9.60 m72vertical positions
2standards / position3ledger levels0%user allowance
Geometry checkGrid covers 12.60 m × 9.60 mBoundary overrun: 0.60 m × 0.60 mNominal standard stack: 4.00 m; jack adjustment is not modeled
03 / GENERATED QUANTITIES

Review before enquiry

These quantities follow your selected geometry and components. Review the covered dimensions and exclusions before sending.

Item codeComponentCounting logicQty
VID-CUP-STD-2000Cuplok Standards — 2.00 m72 positions × 2 standards144
VID-CUP-LDG-1800Cuplok Ledger — 1.80 m7 bays × 9 rows × 3 levels189
VID-CUP-LDG-1200Cuplok Ledger — 1.20 m8 bays × 8 rows × 3 levels192
VID-BAS-UNJ-0750Universal Jack 750mm1 per vertical position72
VID-BAS-UHJU head Jack Solid1 per vertical position72
VID-CUP-SPGCircular Loose Spigot72 positions × 1 stacked joints72
Total planned quantity741
ENGINEERING COMPLETION CHECKLIST

Required before this becomes a complete project quantity.

Not countedDiagonal bracing and plan bracing

Not countedTies, anchors and stability restraints

Not countedDecks, intermediate transoms and access

Not countedGuardrails, toe boards and edge protection

Not countedFoundations, sole boards and bearing checks

Not countedErection sequence, inspection and rescue provisions

Required engineering review: This tool does not determine or approve bay spacing, loading, capacity, bracing, ties, stability, foundations, erection sequence or safe use. Braces, decks, transoms, access and project-specific accessories are excluded. A qualified temporary-works engineer must review the complete arrangement.
One connected workflow

Geometry → quantities → catalogue → WhatsApp.

Open catalogue ↗
WhatsApp